Published on June 10, 2017 by admin


Introducing the V116-2.0 MW™ and V120-2.0 MW™, strengthening and expanding the 2 MW platform, the most widely applied platform in the history of wind energy. The two larger rotors to the Vestas 2 MW platform, deliver more stable energy production and a higher power output at lower wind speeds. Since the introduction of the Vestas 2 MW platform, Annual Energy Production is increased by 40 percent. The video below takes an in-depth look on the latest upgrade to our 2 MW platform and how we are making wind work harder.

Category